BUILDING
> Modular cell design philosophy
> Single story, new concrete construction
> 11,140 SF of technical space per modular cell
> 150-325 watts per square foot


HVAC
> A/C units maintain a climate of 72 degrees (+/-5) and 30-60% humidity
> 7,000+ hours of ambient cooling
> Ambient cooling feature mitigates outage risk
> Chilled water storage


UPS SYSTEM
> UPS in parallel 2N configuration
> Designed to support full load


UTILITY/GENERATOR
> N+1 design
> Diesel storage on site to for a minimum of 24 hours of run time
> Diesel vendor in place with 4 hour SLAs
> CSU Power Plant and 2N CSU generators on site


SECURITY SERVICES
> Card access control at all secure areas/doors
> Exterior and interior CCTV coverage with 30 days of on-site video back-up
> On-site security 24/7
> Phone systems for correspondence with security personnel
> DOD specified stand off distances surrounding entire Park


FIBER
> Fiber connectivity available from Level 3, TWT, Qwest, Verizon and Cogent
> Diverse entry points located on opposite sides of the park


LEED CERTIFICATION
> Built to LEED Platinum certification